| 1. | Defects found during testing were reported in the 测试中发现的缺陷在 |
| 2. | To adjust the equipment and solve the process issues in case of any defect found 当发现次品时调整设备,解决工艺问题 |
| 3. | A vehicle repair order stating all defects found in the examination will be issued 验车中心会发出修理通知令,列明验车时所发现的一切毛病。 |
| 4. | The girder of the south bridge of changchun city highway was strengthed and tested for statical load owing to defects found in the beams 摘要长春环城高速公路南段桥主梁在施工时发生梁体缺陷,加固补强后对其进行静载试验。 |
| 5. | 1 manufacturing corrective action request ( mcar ) system in place to feedback defects found in final lot inspection and request for relevant corrective actions 生产改善行动要求( mcar )系统反映最终批发现之不良专案,并要求作相关改善行动 |
| 6. | Bus fleets with a higher failure record and more safety defects found during the examinations are liable to be called up more frequently 巴士车队如根据记录曾发生较多故障,或在检验时发现在安全方面有较多毛病,则被召唤的次数会较为频密。 |
| 7. | If rework verification is not needed , report the number of major and minor defects found and corrected and the actual rework effort to the moderator 如果返工工作不需要审核,要向评审负责人报告发现和修改的严重缺陷和轻微缺陷的数量,以及实际的返工工作量。 |
| 8. | If a bus fails the called - up examination , the motor vehicle examiner normally require the bus operator to bring back the bus for a re - check within 14 days during which the bus operator must rectify all defects found on the bus 巴士如未能通过召唤检验,车辆检验主任通常会要求巴士营办商在14天内修妥一切毛病,然后将巴士送往验车中心接受重验。 |
| 9. | Statistics and cause analysis of potential safety problems and defects found during the inspection of some lifting appliances are conducted . also , several proposals are offered to improve the current situations 摘要通过对部分起重机械检测过程中发现的安全隐患与缺陷的统计,并对其产生的原因进行分析,提出了几点应重视的建议,以期改变目前的现状。 |
| 10. | If a bus fails the called - up examination , the motor vehicle examiner normally require the bus operator to bring back the bus for a re - check within 14 days during which the bus operator must rectify all defects found on the bus 4 . 9 . 3巴士如未能通过召唤检验,车辆检验主任通常会要求巴士营办商在14天内修妥一切毛病,然后将巴士送往验车中心接受重验。 |